期刊文献+

西霞院水库闸前泥沙防淤堵设计 被引量:2

Anti-siltation Design in Front of Gates in Xixiayuan Reservoir
下载PDF
导出
摘要 西霞院水库泄水建筑物采用集中布置方案,从左岸依次设置3条安装间排沙洞、3条位于机组中间的排沙底孔、3条排沙洞、7孔胸墙式泄洪闸、12孔开敞式泄洪闸及王庄引水闸2孔。闸前排沙洞、排沙底孔事故门冲淤系统主要由自吸泵、管路、阀门及仪表等组成,借鉴了黄河调水调沙试验中人工扰沙的经验,解决了闸前淤积问题。 Xixiayuan Reservoir release works adopts concentrated layout,which from left to right consists of three sediment tunnels under the installation room,three bottom sediment tunnels between units,three sediment tunnels,seven flood gates with breast wall,twelve open flood gates and two division gates to Wangzhuang.Anti-siltation system in front of gate consists of self-priming pump,pipeline,valve and instruments.The experience of artificial sediment disturbance in the Yellow River water and sediment regulation test is used in the design.The choice of method and factors for siltation scouring,equipments layout and control requirements are discussed in the paper.
出处 《人民黄河》 CAS 北大核心 2011年第9期104-105,共2页 Yellow River
关键词 泥沙淤积 泄水建筑物 闸门 冲淤系统 西霞院水库 sedimentation water releasing engineering works gate siltation scouring system Xixiayuan Reservoir
  • 相关文献

参考文献1

  • 1李纪新,陈丽晔.西霞院反调节水库闸 门设计[G]//水利部小浪底水利枢纽建设管理局.黄河小浪底水利枢纽配套工程——西霞院反调节水库建设论文集.北京:中国水利水电出版社,2006:160-168.

同被引文献10

引证文献2

二级引证文献1