期刊文献+

The design of Three Gorges Hydropower Station

The design of Three Gorges Hydropower Station
下载PDF
导出
摘要 Using physical model and numerical simulation techniques,some technical problems were studied systematically,including layout of power station,measures of sediment and floating debris discharging,types of intake,embedded types of spiral case,layout of underground powerhouse tunnel group and block reinforcement.It was optimal in technique and economy with the arrangement of powerhouse at the dam-toe of both banks +underground powerhouse in the right bank,as well as the intake with a single and small orifice.The sediment and debris problems could be solved with disperse sediment ejection and floating debris discharging holes.With the adoption of techniques for spiral cases such as heat and pressure preservation,cushion layer and combined embedding,the stable operation of generating units can be guaranteed.The arrangement of tailrace tunnel with sloping ceiling was better than that of tailrace surge tank.The technical requirements related to the embedding type of spiral case were proposed.The reinforcement of huge unfavorable blocks was discussed and the new idea for block reinforcement using anti-sliding piles and normal compressive stress of structural plane was put forward. Using physical model and numerical simulation techniques, some technical problems were studied systemati- cally, including layout of power station, measures of sediment and floating debris discharging, types of intake, embed- ded types of spiral ease, layout of underground powerhouse tunnel group and block reinforcement. It was optimal in technique and economy with the arrangement of powerhouse at the dam-toe of both banks + underground powerhouse in the right bank, as well as the intake with a single and small orifice. The sediment and debris problems could be solved with disperse sediment ejection and floating debris discharging holes. With the adoption of techniques for spiral cases such as heat and pressure preservation, cushion layer and combined embedding, the stable operation of generating units can be guaranteed. The arrangement of tailrace tunnel with sloping ceiling was better than that of tailrace surge tank. The technical requirements related to the embedding type of spiral case were proposed. The reinforcement of huge unfavorable blocks was discussed and the new idea for block reinforcement using anti-sliding piles and normal compressive stress of structural plane was put forward.
出处 《Engineering Sciences》 EI 2011年第3期66-73,共8页 中国工程科学(英文版)
关键词 三峡水电站 数值模拟技术 设计 地下厂房 物理模型 经济中心 嵌入技术 稳定运行 Three Gorges Power Station layout sediment and floating debris discharging spiral case embedding shallow embedment block reinforcement
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部