针对我国高速铁路在施工建设过程中架设桥梁的需求,对900 t级架桥机的提梁小车的U型凹式结构进行常规计算与有限元分析,分析激励频率对支撑结构的影响,为机构选型和修正运动参数提供参考。
In view of the demand of building bridges in the construction process of high-speed railway,the paper applies routine calculations and finite element analysis to U-shaped concave structure of the winch trolley of 900 t-level bridge erecting machine,and analyzes the impact of the excitation frequency to the support structure,providing a reference for the mechanism selection and correction of motion parameters.
出处
《起重运输机械》
2011年第9期46-49,共4页
Hoisting and Conveying Machinery
基金
山西省自然科学基金项目(2010011031-4);资助山西省普通高等本科学校大学生创新性实验项目(200901SJ)资助
关键词
架桥机
提梁小车
支撑结构
有限元分析
bridge erecting machine
winch trolley
support structure
finite element analysis