厦门翔安海底隧道F1风化深槽注浆加固技术 被引量:5

Study on the grouting technology adopted in F1 weathered trough for Xiamen Xiang'an Subsea Tunnel
下载PDF
导出
摘要 以厦门翔安海底隧道涌水量最大、施工难度最大的海域段F1风化槽为研究对象,根据其围岩地质条件和突涌水特点,采用全断面注浆加固和堵水,注浆加固范围为掌子面内及隧道开挖轮廓线外5 m,隧道纵向加固长度为70 m,注浆材料以超细水泥单液浆为主的注浆加固方案。施工期现场监控量测与数值计算结果表明:F1风化深槽围岩注浆加固效果均较为理想,未发生涌水突泥,达到了设计的技术要求。该项研究成果为今后开展类似工程的注浆加固提供了技术借鉴。 Focusing on F1 weathered trough which has maximum water inflow and great difficulty in construction in Xiamen Xiang'an Subsea Tunnel,full-sectional grouting reinforcement and waterproofing,5 m grouting inside heading,70 m along longitudinal direction of tunnel and superfine cement single-fluid grouting as major grouting material were applied according to poor geological conditions and the character of sudden water inflow.Meanwhile,the corresponding parameters of grouting were established after drillings for grouting were conducted.The results of field monitoring and numerical calculation during construction show that the grouting-effect meets the qualifications of design and construction of Xiamen Xiang'an Subsea Tunnel.The research results can provide technical reference for similar projects in grouting and waterproofing.
出处 《中国工程科学》 2011年第9期38-41,50,共5页 Strategic Study of CAE
基金 国家自然科学基金面上项目(40772184)
关键词 海底隧道 注浆加固 稳定性 数值仿真 Ximen Xiang'an Subsea Tunnel grouting reinforcement stability numerical simulation
  • 相关文献

参考文献6

二级参考文献42

  • 1杨家岭,邱祥波,陈卫忠,李术才.海峡海底隧道及其最小岩石覆盖厚度问题[J].岩石力学与工程学报,2003,22(z1):2132-2137. 被引量:20
  • 2杨秀竹,王星华,雷金山.宾汉体浆液扩散半径的研究及应用[J].水利学报,2004,35(6):75-79. 被引量:91
  • 3阮文军.注浆扩散与浆液若干基本性能研究[J].岩土工程学报,2005,27(1):69-73. 被引量:262
  • 4李术才,徐帮树,李树忱.海底隧道衬砌结构选型及参数优化研究[J].岩石力学与工程学报,2005,24(21):3894-3902. 被引量:46
  • 5邹金锋,李亮,杨小礼.劈裂注浆扩散半径及压力衰减分析[J].水利学报,2006,37(3):314-319. 被引量:91
  • 6Scheweiger H F, Kummerer C. Numerical Modeling of Settlement Compensation by Means of Fracture Grouting [J]. Soils and Foundations, 2004, 44(1): 71-86.
  • 7[2]张民庆,韩占波,孙国庆,等.圆梁山隧道PDK354+255~PDK354+275溶洞段施工技术[J].铁道工程学报,2002,(4):71-78.(Zhang Minqing,Han Zhanbo,Sun Guoqing,et al.Construction technology of cavity section PDK354+255~PDK354+275 in parallel heading at intake portal of Yuanliangshan Tunnel[J].Journal of Railway Engineering Society,2002,(4):71-78.(in Chinese))
  • 8[5]张民庆.饱和含水砂层施工技术[A].见:第十届隧道年会论文集[C].[s.l.]:[s.n.],1998.543-547.(Zhang Minqing.Engineering technique of saturation and containing water sand[A].In:Proceedings of the 10th Tunnel Academic Conference Symposium[C].[s.l.]:[s.n.],1998.543-547.(in Chinese))
  • 9铁道部第二勘测设计院.铁路工程设计技术手册:隧道[M].北京:中国铁道出版社,1999.444-450.
  • 10岩土注浆理论与工程实例协作组.岩土注浆理论与工程实例[M].北京:科学出版社,2001..

共引文献527

同被引文献50

引证文献5

二级引证文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部