庆阳高庄桥加固方案研究 被引量:2

Study on Reinforcement Plan for Gaozhuang Bridge in Qingyang
下载PDF
导出
摘要 文章根据甘肃省庆阳市高庄桥的病害调查,分析了产生不同病害的原因,提出钢筋混凝土套箍封闭主拱拱肋、黏贴钢板加固主拱拱肋和活性微粉混凝土(RPC)套箍封闭主拱拱肋三种加固方案,并对拱桥加固前后的结构进行有限元分析,论证三种加固方案对拱桥的应力改善效果。 According to the defect investigation of Gaozhuang Bridge in Qingyang,Gansu,the article analyzes the different causes and proposes three reinforcement plans such as using reinforced concrete,attaching steel board,or using active RPC to seal off the arch.It also performs finite element analysis on the bridge structure before and after the reinforcement to demonstration of the effects.
出处 《西部交通科技》 2011年第8期45-48,共4页 Western China Communications Science & Technology
关键词 桥梁工程 病害 加固方案 效果分析 Bridge construction Defect Reinforcement plan Performance analysis
  • 相关文献

参考文献3

  • 1客运专线活性粉末混凝土(RPC)材料人行道挡板、盖板暂行技术条件[Z].铁道部科技司.
  • 2Bonneau O, Lachemi M, Dallaire F Mechanical proper- ties and durability of two industrial reactive powder concretes[J]. ACI Mater J, 1997,94(4) : 286 - 290.
  • 3Dugat J,Roux N,Bernier G. Mechanical properties of re- active powder concrete[J]. Mater Struct, 1996,29 (4) : 233 - 240.

共引文献1

同被引文献10

  • 1刘红伟.双柱支撑盖梁施工工艺[J].山西建筑,2005,31(3):72-73. 被引量:1
  • 2胡钊芳.公路旧桥加固技术与实例[M].北京:人民交通出版社,2001.
  • 3GB50367-2006,混凝土结构加固设计规范[S].
  • 4四川省建筑科学研究院.混凝土结构加固设计规范[S]北京:中国建筑工业出版社,2006.
  • 5张树仁;王宗林.桥梁病害诊断与改造加固设计[M]北京:人民交通出版社,2006.
  • 6陈开利;王邦楣;林亚超.桥梁工程鉴定与加固手册[M]北京:人民交通出版社,2005.
  • 7候发亮.建筑结构粘结加固的理论与实践[M]武汉:武汉大学出版社,2003.
  • 8中交第一公路勘察设计研究院有限公司.公路桥梁加固施工技术规范[S]北京:人民交通出版社,2008.
  • 9陈强,吴才俊.桥梁病害加固技术探讨[J].现代交通技术,2011,8(3):45-47. 被引量:13
  • 10高飞.公路桥梁施工体外预应力加固技术探析[J].山西建筑,2012,38(21):204-204. 被引量:5

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部