期刊文献+

楔形铣刨刀具受力计算模型及其影响规律分析

Analysis on force model of wedge-shaped milling cutters and influence laws
原文传递
导出
摘要 为满足戈壁地表砂土的铣刨收集要求,通过对铣刨切削装置的工作原理、旋转方式和铣削运动参数的理论分析,建立了楔形铣刨刀具砂土切削的力学计算的数学模型。根据收集研究区域不同深度砂土的材料强度,利用该数学模型并运用计算机仿真,研究了楔形铣刨刀具的运动参数、几何参数与切削受力之间的关系,得出了给定条件下楔形铣刨刀具设计参数对砂土切削受力的影响规律,研究成果为楔形铣刨刀具结构及其收集工艺参数的优化设计奠定基础。 In order to satisfy the requirements of milling and collecting gravelly soil on the gobi surface, after theoretical analysis being carried out for the working principle, rotation modes and motion parameters of the milling device, a mathematical model for milling gravelly soil by wedge-shaped milling cutters is built.According to the strength of gravelly soil in different depths in collection areas, the mathematical model and computer simulation are used to study the relationship among motion parameters, geometric parameters and cutting resistance of the wedge-shaped cutter. The influence laws of design parameters of the wedge-shaped milling cutter on the cutting resistance of gravelly soil under the given conditions are obtained. The study results lay foundations for the optimization of the structure and milling parameters of the wedge-shaped milling cutter.
出处 《矿山机械》 北大核心 2011年第10期112-117,共6页 Mining & Processing Equipment
基金 国家自然科学基金项目(50875158) "十一五"科技支撑计划(2006BAB11B05)
关键词 砂土切削 楔形铣刨刀具 力学模型 设计参数 影响规律 gravelly soil cutting wedge-shaped milling cutter mechanical model design parameter influence law
  • 相关文献

参考文献8

二级参考文献22

  • 1齐晓杰,康建营,齐英杰,段宏伟.路面铣刨刀具材料失效分析与强化研究[J].林业机械与木工设备,2005,33(9):19-21. 被引量:3
  • 2Australian Construction Services. Maralinga rehabilitation project phase 1 : Contaminated soil removal [R]. Department of Primary Industries and Energy, 2003.
  • 3Reynolds Electrical & Engineering Co. Land surface clean-up of plutonium at the Nevada Test Site, CONF-910981-29 [R]. U.S. Department of Energy, 1991.
  • 4Maralinga Rehabilitation Technical Advisory Committee. Maralinga rehabilitation project: Project manager's report (1994-2000) [R]. Depart -ment of Education, Science and Training, 2002.
  • 5Maralinga Rehabilitation Technical Advisory Committee. Rehabilitation of former nuclear test sites at Emu and Maralinga (Australia) 2003 [R]. Department of Education, Science and Training, 2002.
  • 6Information Research and Analysis Nevada Applied Ecology Information Center. Nevada Test Site environmental management end state vision, DOE/NV-958[R]. U.S. Department of Energy, 1995.
  • 7Nevada Operations Office. Development of site specific soil cleanup criteria. ANL-OHS/HP -83-200 [R]. U.S. Department of Energy, 1991.
  • 8Nevada Operations Office. Evaluation of technologies for volume reduction of plutonium-contaminated soils form the Nevada Test Site, DOE/NV/10845-57[R]. U.S. Department of Energy, 1998.
  • 9Maralinga Rehabilitation Technical Advisory Committee. Maralinga rehabilitation project phase 1 : Operational plant modifications[R]. Department of Primary Industries and Energy, 2003.
  • 10Maralinga Rehabilitation Technical Advisory Committee. Maralinga rehabilitation project phase 1: Plant modifications design review [R]. Department of Primary Industries and Energy, 2003.

共引文献46

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部