期刊文献+

考虑相关失效的备件优化配置模型 被引量:5

Allocation optimization model for spare parts concerned with dependent failures
下载PDF
导出
摘要 相关失效普遍存在于各类系统,以传统计算独立部件的备件配置量的方法来确定相关失效部件的备件配置量,往往导致较大的误差。分析了故障源部件的备件保障水平与相关失效部件的故障率的关系,给出了考虑相关失效情况下各类部件的备件期望短缺量与保障费用的计算方法,并以保障费用为目标,备件期望短缺量为约束提出备件优化配置模型,给出了求解该模型的算法。最后通过案例分析,验证了该模型的合理性与工程适用性。 Dependent failures exist commonly in all kinds of systems. The traditional way of independent spare parts allocation is expected to cause great errors when it is applied to the spare parts allocation with dependent failures concerned. This paper analyzes the relation between the spare parts support level of fault source parts and the failure rate of the dependent parts. Computing methods for expected backorder and support cost of various parts are put forward. Furthermore, an optimal allocation model for spare parts including its solution is proposed with cost as its object and within constraints of expected backorder quantity. Eventually, the rationality and the project applicability of this model are proved through a case study.
出处 《系统工程与电子技术》 EI CSCD 北大核心 2011年第10期2338-2342,共5页 Systems Engineering and Electronics
基金 国家自然科学基金(60904002 70971132)资助课题
关键词 备件 相关失效 优化配置 短缺量 费用 spare part dependent failure optimal allocation backorder ~ cost
  • 相关文献

参考文献18

  • 1Hoyland A, Rausand M. System reliability theory : models and statistical methods[M]. New York: Wiley, 1994.
  • 2郭波,武小悦,张秀斌,等.系统可靠性分析[M].长沙:国防科技大学出版社,2004.
  • 3Mosleh A. Dependent failure analysis[J]. Reliability Engineering and System Safety,1991,34(3):243- 248.
  • 4Humphreys P, Jenkins A M. Dependent failures developments[J]. Reliability Engineering and system Safety, 1991,34 ( 3 ) : 417 - 427.
  • 5谢里阳,李翠玲.相关系统失效概率的次序统计量模型及共因失效原因分析[J].机械强度,2005,27(1):66-71. 被引量:18
  • 6Shcrbrookc C C. Optimal inventory modeling of systems :multiechelon techniques[M]. 2nd ed. Boston: Kluwer Academic Publishers, 2004.
  • 7Perlman Y, Mehrez A, Kaspi M. Setting expediting repair policy in a muhi echelon repairahle iten, inventory system with limited repair capacity[J].Journal of the Operational Research Society ,2001 .52(2) : 198 - 209.
  • 8Al-Rifai M H, Rossetti M D. An efficient heuristic optimization algorithm for a two-echelon (R, Q) inventory system[J].International Journal of Production Economics , 2007,109(1/2) : 195 - 213.
  • 9Wong H, van Houtum G J, Cattrysse D, et al. Multi-item spare parts systems with lateral transshipments and wailing time constraints [J].European Journal of Operational Research, 2006,171 (3) : 1071 - 1093.
  • 10Topan E, Bayindir Z P, Tan T. An exact solution procedure for multi-item two echelon spare parts inventory control problem with batch ordering in the central warehouse[J].Operations Research Letters ,2010,38(5) :454 - 461.

二级参考文献15

  • 1谢民育.次序统计量线性组合之分布及其在可靠性统计中的应用[J].应用数学,1989,2(1):53-60. 被引量:4
  • 2Levitin G. Incorporating common-cause failures into non-repairable multi-state series -parallel system analysis. IEEE Transaction on Reliability, 2001, 50(4): 380~385.
  • 3Hughes R P. A new approach to common cause failure. Reliability Engineering, 1987, 17: 211~236.
  • 4Mosleh A, Parry G W, Zikria A F. An approach to the analysis of common cause failure data for plant-specific application. Nuclear Eng. and Design, 1994,150: 25~47.
  • 5Hauptmanns U. The multi-class binominal failure rate model. Reliability Eng. and System Safety, 1996, 53: 85~96.
  • 6Kvam P H,Miller J G. Common cause failure prediction using data mapping. Reliability Engineering and System Safety, 2002, 76: 273~278.
  • 7Xie L Y. A knowledge based multi-dimension discrete CCF model. Nuclear Eng. Design, 1998, 183: 107~116.
  • 8Gupta R C. Reliability of a k out of n system of components sharing a common environment. Applied Mathematics Letters,2002,15:837~844.
  • 9Goble W M,Brombacher A C,Bukowski J V,et al. Using stress-strain simulations to characterize common cause. In:Mosleh A R, Bari A,eds. Probabilistic Safety Assessment and Management (PSAM4), New York: Springer, 1998. 519~403.
  • 10Rczaci J. Economic order quantity model with backordcr for imperfect quality items [ C ]//Proceedings of the Engineering Management Conference. Washington DC : IEEE Press ,2005,9 (2) : 466 - 470

共引文献31

同被引文献92

  • 1阮旻智,李庆民,李承,黄傲林.改进的分层边际算法优化备件的初始配置方案[J].兵工学报,2012,33(10):1251-1257. 被引量:21
  • 2王晓燕,申桂香,张英芝,郑珊,牛序磊,梁栋.基于DEMATEL方法的数控装备故障相关性分析[J].吉林大学学报(工学版),2012,42(S1):100-103. 被引量:13
  • 3王晓峰,申桂香,张英芝,张立敏,王志琼,刘葳.加工中心可靠性与维修性影响度仿真分析[J].吉林大学学报(工学版),2011,41(S1):160-163. 被引量:1
  • 4Willem V, Rommert D. Spare parts stock control for redundant systems using reliability centered maintenance data[J]. Relia- bility Engineering and System Safety, 2011, 96 (11) : 1576 - 1586.
  • 5Iman N, Seyed R H. A multi-objective approach to simultaneous determination of spare part numbers and preventive replacement times[J]. Applied Mathematical Modelling, 2011, 35 (3) 1157 - 1166.
  • 6Chen F L, Chen Y C, Kuo J Y. Applying moving back-propaga- tion neural network and moving fuzzy neuron network to predict the requirement of critical spare parts[J]. Expert Systems with Applications, 2010, 37(6): 4358-4367.
  • 7Darko L, Rodrigo P, Dragan B, et al. Condition-based spares ordering for critical components[J]. Mechanical Systems and Signal Processing, 2011, 25(5) :1837 - 1848.
  • 8Eugene L, Yael P, Cheng T, et al. A network approach to mod- eling the multi-echelon spare-part iaventory system with back- orders and interval-valued demand[J].International Journal of Production Economics, 2011, 132(1) : 43 - 51.
  • 9Wang W B. A joint spare part and maintenance inspection opti- mization model using the delay-time concept[J]. Reliability Engineering and System Safety, 2011, 96(11) : 1535 - 1541.
  • 10Rainer K, Simone Z, Lucio Z. On how buyback and remanufac- turing strategies affect the profitability of spare parts supply chains[J]. International Journal of Production Economics, 2011, 133(1): 135-142.

引证文献5

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部