期刊文献+

超长结构温度预应力筋控制裂缝施工技术 被引量:1

On crack control construction technology with temperature prestressing tendon of super-long structure
下载PDF
导出
摘要 针对工程超长结构裂缝问题,采取设置后浇带方法及布设温度预应力筋技术,结合后浇带与预应力技术的优势,在后浇带封闭以前,张拉预应力筋,使得预应力效应得以充分建立;后浇带封闭以后,结构形成受力整体,从而对确保工程质量起到了重要作用。 According to the adopted post-pouring band method and the layout of the temperature prestressing tendon technique in the cracks problems of the super-long structure,the paper combining with the advantages of the post-pouring band and the prestressing technique,fully establishes the prestressing effect by stretching the prestressing tendon before sealing the post-pouring band,and forms the stress integration in the structure after the sealing of the post-pouring band,so as to ensure the important role of the engineering quality.
作者 石彦明
出处 《山西建筑》 2011年第30期100-101,共2页 Shanxi Architecture
关键词 后浇带 温度预应力 张拉 post-pouring band temperature prestress stretching
  • 相关文献

参考文献1

二级参考文献4

  • 1危健文.混凝土楼板非结构裂缝原因及其防治[J].山西建筑,2007,33(10):204-205. 被引量:3
  • 2袁海军,姜红.建筑结构检测鉴定与加固手册[M].北京:中国建筑工业出版社,1997.
  • 3崔士起 成勃 李龙 等.混凝土裂缝内粘外锔法综合处理技术研究.工业建筑,2009,39:298-300.
  • 4GB50367-2006,混凝土结构加固设计规范[S].

共引文献2

同被引文献4

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部