摘要 为了预防电力变压器运行过程中因铁芯多点接地导致接地电流超标而造成的铁芯发热故障,提出了一种新的变压器铁芯接地智能保护原理,并通过对变压器铁芯接地电流的实时监测,在检测到接地线电流超过国家标准后采取自动启动限流装置的措施,实现将接地电流限制在规程要求的范围之内,并对电气设备状态进行在线检修、评估、预警和风险分析,从而达到防患于未然的目的。 In order to prevent the iron-core from the fault of the iron-core heating because of the earthing current exceeding in the operation process of the transformers,the paper points out the new iron-core earthing intelligent protection principle for the new transformers,adopts the automatic current limiter when the earthing current surpasses the national standards by the time supervision of the iron-core earthing current of the transformers,realizes the earthing current to be limited within the regulation,and undertakes the on-line maintenance,the evaluation,the early warning,and the risks analysis on the electronic equipment,so as to prevent the accidents before they occur.
作者 高善学
出处 《山西建筑》 2011年第30期127-127,211,共2页 Shanxi Architecture
关键词 变压器铁芯 多点接地 智能保护 iron-core of transformer multiple earthing intelligent protection
  • 相关文献

参考文献4

  • 1DL/T572-95.电力变压器运行规程[S].[S].,..
  • 2耿江海,律方成,刘云鹏,等.变压器铁芯接地电流理论分析[DB].南京:中国电力高等学校电力系统及其自动化专业第22届年会,2006.
  • 3吴向东 覃绍先 赵鹏.输电线路绝缘子泄漏电流与周围环境的关系.高电压技术,2007,.
  • 4付斌,李仲夫,姚勇,王世辉.输电线路上冰风荷载的实时监测系统[J].中国电力,2001,34(4):47-50. 被引量:6

二级参考文献4

  • 1东北电力设计院.电力工程高压送电线路设计手册[M].北京:水利电力出版社,1991..
  • 2中南电力设计院.平武工程中山口大跨越设计说明书[M].1980.
  • 3中南电力设计院.三峡电力外送筹建冰风观测站可行性研究报告[R].1994.
  • 4M.Tabatabai S.G.Krishnasamy Kastelein 在Smiths Falls至渥太华输电线路上的冰风荷载监测[R].1993.