期刊文献+

应用年最大值法推求城市暴雨强度公式的研究 被引量:37

Feasibility study on deriving the urban storm intensity formula through annual maximum value method
下载PDF
导出
摘要 目前采用年最大值法采样的条件日趋成熟。比较了年最大值法与年多个样法推求暴雨强度公式的差别,并通过北京市的实例分析了两种取样方法获得的样本在重现期上存在的关系。在此基础上论述了推行年最大值法取样推求暴雨强度公式存在的问题及建议,提出了该方法在未来应用的可行性,为未来过渡到采用年最大值法选样提供参考依据。 At present,conditions of using annual maximum value method for sampling is becoming more and more mature.This paper compared the difference between annual maximum value method and annual multi-sampling method in deriving storm intensity formula,and analyzed the relationship of return period between samples collected by two different methods in case study in Beijing.Based on this,the problems in application of annual maximum value mtheod in deriving the storm intensity formula were discussed and the related suggetions were offered.The fesibility of the future application of this method was put forward,which offered the references for the future transition to annual maximum value method.
出处 《给水排水》 CSCD 北大核心 2011年第10期40-44,共5页 Water & Wastewater Engineering
关键词 暴雨强度公式 年最大值法 年多个样法 设计标准 Storm intensity formula Annual maximum value method Annual multi-sample method Design standard
  • 相关文献

参考文献2

二级参考文献12

共引文献98

同被引文献306

引证文献37

二级引证文献199

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部