摘要
东莞水道大桥是东莞五环路西环段上的一座特大桥,主桥采用三孔50 m+280 m+50 m的中承式钢管混凝土系杆拱桥。该文重点介绍该桥主桥施工加载程序设计。
Dongguang Shuidao Bridge is an overlong bridge in west ring section of Dongguang Ring V Road.The main bridge is the half through concrete-filled steel tube bowstring arch bridge with three 50 m+280 m+50 m spans.The article focuses introduction on the design of construction loading program for the main bridge of this bridge.
出处
《城市道桥与防洪》
2011年第8期213-216,11,共4页
Urban Roads Bridges & Flood Control
关键词
东莞水道大桥
中承式
拱桥
系杆拱
钢管混凝土结构
施工加载程序
Dongguang Shuidao Bridge,half through,arch bridge,bowstring arch,concrete-filled steel tube structure,construction loading program