摘要
介绍了南京市东曹泵站拆建工程的设计、施工工艺、施工设备和施工程序,同时还介绍了施工质量控制与现场监测的方法,总结了树根桩在地基处理中的特点。
The article introduces the design,construction technology,construction equipment and construction program of Nanjing City Dongcao Pumping Station Dismounting Construction Project,describes the construction quality control and field monitoring methods,and sums up the characteristics of tree-root pile in the subgrade treatment.
出处
《城市道桥与防洪》
2011年第8期243-244,18-19,共2页
Urban Roads Bridges & Flood Control
关键词
水利泵站
树根桩
地基加固
water conservancy pumping station,tree-root pile,subgrade reinforcement