摘要
介绍了上海F1赛场赛道使用7 a来出现的自然沉降和局部弯道区域颠簸状况。为了下个7 a使用期的良好使用,进行了建成以来首次局部修缮施工。详细介绍了这次维修施工的设计和各项施工技术指标,以及内外场试验检测结果。
The article introduces the natural settlement of Shanghai 'F1' International Circuit Track put into use for 7 years and the bumpy status of the partial curving area.In order to be the good use for the next 7 years,it is locally repaired and constructed firstly after its completion.The article introduces in detail various design and construction technical indexes of this repair construction,and the indoor and outdoor experimental inspecting test results.
出处
《城市道桥与防洪》
2011年第9期37-39,319,共3页
Urban Roads Bridges & Flood Control
关键词
上海国际赛道
修缮
高精度施工控制
Shanghai International Circuit,repair,precision construction control