摘要 水下三通在海底管道分布密集的区域具有广阔的应用前景。在绥中36-1油田一期调整开发工程中,首次在国内应用了可双向通球水下三通。与普通Y形三通和可转向Y形三通相比,可双向通球水下三通使主、支管道均可实现双向通球,因此其清管操作不会受到油气输送方向的限制,使海底管道的总体布置更加灵活。针对水下三通传统安装方法存在的缺陷,提出了等长管段预安装水下三通法,用铺管船预先铺设等长直管段,再由等长水下三通段进行替换,该方法提高了管道施工效率,降低了安装难度和风险,节省了工程投资,对海洋石油工程具有借鉴意义。 Experts expect that underwater tee joint has an wide application perspective in the areas where submarine pipelines are laid intensively. It is the fi rst time in China that the underwater tee joint of bi-directional pig is applied in the fi rst phase of the exploitation project of Suizhong 36-1 Offshore Oilf ield. Compared with the general Y-shaped joint and turnable Y-shaped joint, the bi-directional pigging for main pipe and branch pipe can both be realized by using the underwater tee joint,the cleaning operation will not be restricted along the direction of oil and gas transmission,and this can make the general layout of submarine pipelines greater flexibility. The pre-installation method of underwater tee joint using equal-length pipe is presented to offset the existed defects in ordinary installation methods of underwater tee joint. The equal-length straight pipes are laid in advance with pipe-laying vessel to replace them with equal-length underwater tee joints. This method can improve the eff iciency of pipeline construction,reduce the installation difficulty and risk,and save engineering investment,which can be used for reference in offshore petroleum projects.
机构地区 中海油研究总院
出处 《油气储运》 CAS 北大核心 2011年第9期705-707,631,共3页 Oil & Gas Storage and Transportation
关键词 海底管道 双向通球 水下三通 等长管段 预安装法 submarine pipeline,bi-directional pig,underwater tee joint,equal-length pipe,pre-installation method
  • 相关文献

参考文献3

共引文献20

同被引文献23

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部