期刊文献+

尾矿库洪水漫顶溃坝演化规律试验研究 被引量:38

Experimental Study on Evolution Law of Tailings Dam Flood Overtopping
下载PDF
导出
摘要 为分析尾矿库洪水漫顶溃坝的演化规律,采用物理模型试验方法建立尾矿库漫顶溃坝演化模型。在自主研制的尾矿库溃坝模拟试验平台上,以国内某尾矿库为研究对象,基于非恒定水流泥沙非平衡非饱和冲刷机理,根据模型相似理论和溃决侵蚀模型原理,模拟尾矿库洪水漫顶溃坝过程,建立尾矿库漫顶溃坝演化模型。试验结果表明,尾矿库洪水漫顶溃坝位移与坝体饱和程度有关,坝体浸润线越高,尾矿库溃坝时滑动位移越大,溃口破坏程度取决于溢流对坝体的冲刷侵蚀作用;在该试验条件下,获得尾矿库洪水漫顶溃坝过程中坝体位移、浸润线高度、溃口最大流速和溃口的演化规律。降低坝体浸润线高度、增大安全干滩长度、铺设坝面引流明渠等措施有助于减少尾矿库洪水漫顶溃坝的灾害破坏。 To analyze the tailings dam failure evolution pattern,a tailings dam overtopping evolution model was studied based on physical model experiment method.With a certain tailing dam as the research object,based on non-constant unsaturated flow and sediment erosion mechanism of non-equilibrium theory,and according to the model similarity theory and dam breach erosion model,the tailings dam overtopping breach evolution pattern was investigated on a self-developed tailings dam breaking simulation platform.The results show that the dam displacements depend on the dam saturation degree during tailings dam flood overtopping failure.The higher the saturation line is,the larger the sliding displacements are.The dam failure extent is related with the overflow breach erosion.In this experimental condition,the dam displacements,saturation line height,the maximum flow and the dam break evolutions were presented.Decreasing the saturation line height,increasing the dry beach length,setting up dam surface drainage channels and other measures can help reduce the tailings dam flood overtopping failure disaster.
出处 《中国安全科学学报》 CAS CSCD 北大核心 2011年第7期118-124,共7页 China Safety Science Journal
基金 国家自然科学基金资助(50974109) "十一五"国家科技支撑计划重点资助项目(2006BAK04B04)
关键词 尾矿库 漫顶 溃坝 演化 溃决侵蚀 tailings dam overtopping dam failure evolution breach erosion model
  • 相关文献

参考文献11

二级参考文献55

  • 1甘祥根.物理模型及其应用[J].广东技术师范学院学报,2004,25(6):17-19. 被引量:11
  • 2胡修文,唐辉明,刘佑荣.三峡库区赵树岭滑坡稳定性物理模拟试验研究[J].岩石力学与工程学报,2005,24(12):2089-2095. 被引量:67
  • 3陈守义.浅议上游法细粒尾矿堆坝问题[J].岩土力学,1995,16(3):70-76. 被引量:41
  • 4尹光志,余果,张东明,孙国文.细粒尾矿堆积坝物理模型试验研究[J].矿业安全与环保,2005,32(5):4-5. 被引量:2
  • 5钟式范,马水山,张保军.隔河岩水利枢纽水库蓄水对岸坡稳定性的影响[J].岩石力学与工程学报,1996,15(3):282-288. 被引量:17
  • 6中华人民共和国交通行业标准编写组.公路加筋工程设计规范(JTJ015-91)[S].北京:人民交通出版社,1999..
  • 7GOMEZ G, BAOS R, GOMARA B, et al. Influence of a mine tailing accident near donana national park (Spain) on heavy metals and arsenic accumulation in 14 species of waterfowl[J]. Archives of Environmental Contamination and Toxicology, 2004, 47(4) : 521-529.
  • 8MILTON A, COOKE J A, JHONSON M S. A comparison of cadmium in ecosystems on metalliferous mine tailings in wales and Ireland[J]. Water, Air, & Soil Pollution, 2004, 153(1/4) : 157-172.
  • 9ROSNER T, SCHALKWYK A V. The environmental impact of gold mine tailings footprints in the Johannesburg region, South Africa [J]. Bulletin of Engineering Geology and Environment, 2000, 59 (2) : 137-148.
  • 10SCHWARTZ M O, SCHIPPERS A, HAHN L. H · rochemical models of the sulphidic tailings dumps at Matchless (Namibia) and Selebi- Phikwe ( Botswana ) [ J ]. Environmental Geology,2006,49 (4) : 504-510.

共引文献193

同被引文献408

引证文献38

二级引证文献336

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部