摘要 循环流化床(CFB)的物料平衡和物料浓度是保证锅炉正常运行的基础。大唐红河发电有限责任公司通过对其2台300 MW CFB锅炉每次起动的情况进行总结,逐步掌握了低床料起动的控制要点,即控制好床压、床温并且通过给煤线向炉膛内加床料,这样的起动方式,显著缩短了锅炉的起动时间,减少了起动用油。 The material balance and the materials concentration are bases for ensuring normal operation of CFB boilers.Through summarization of situation in starting-up of CFB boilers equipped for 2×300 MW units at each time,Datang Honghe Power Generation Co Ltd has gradually grasped the main points of control in strating up of CFB boilers for 300 MW units with low bed material,i.e.adding bed material into furnace through coal-feed line,and the bed pressure and bed temperature should be well controlled.By using said starting-up mode,the time used for starting the CFB boiler up can be substantially shortened,and the fuel oil consumed in starting-up can be reduced.
出处 《热力发电》 CAS 北大核心 2011年第9期56-58,64,共4页 Thermal Power Generation
关键词 CFB锅炉 低床料 起动 物料平衡 床压 床温 CFB boiler low bed material start up material balance bed pressure bed temperature
  • 相关文献

参考文献5

二级参考文献52

  • 1白玉刚,吕俊复,刘青,岳光溪,刘宝森,杨艳萍,于龙,马明华.方型分离器进口气流速度的实验研究[J].应用基础与工程科学学报,1999,7(3):308-313. 被引量:3
  • 2郑洽余,刘信刚,金燕.循环流化床锅炉燃烧室内焦炭粒子燃烧特性的研究[J].工程热物理学报,1995,16(1):106-110. 被引量:16
  • 3[1]Feng J K,Yue G X.New Achievement of Development of CFBC Boiler in China.In:Chen KM,Sarlos G,Tong T W eds.Proceedings of the International Conference on Energy and Environment.Shanghai,China:China Machine Press,1998:505~510
  • 4[4]Dallas W T,Lqbal A.An Update of Operating Experiences Burning Petroleum Coke in a Utility Scale CFB:The NISCO Cogeneration Project In:Kay J H,eds.Proceedings of the 14th International Conference on Fluidized Bed Combustion,1997,1:57 ~70
  • 5[5]Yue G X,Li Y,Zhao X X,et al.The first Pilot Compact CFB Boiler with Water-Cooled Separator in China.In Kay J H,des.Proceedings of the 14th International Conference on Fluidized Bed Combustion,1997,1:497~506
  • 6[1]MOE T A, MANN M D, HENDERSON A K,et al. Pilot scale CFBC systems: A valuable tool for design and permitting[A]. In : Avidan A A, ed. Proc 4th Int Conf CFB[C]. USA:Pennsylvania, ASME Press, 1993: 116-122.
  • 7[2]GLICKSMAN L R, HYRE M, WESTPHALEN D. Verification of scaling relations for circulating fluidized beds[A]. In: Rubow L N, Commonwealth G, eds. Proc 4th Int Conf CFB[C].USA: San Diego, ASME Press, 1993: 69-70.
  • 8[3]HORIO M. Hydrodynamics of circulating fluidization: present status and research needs[A]. In: Basu P, Large J F, eds. Proc 1st Int Conf CFB[C].Oxford: Pergamon Press, 1991:3-14.
  • 9[4]DIET P W. Collection efficiency of cyclone separators[J]. AIChE, 1981,27(6):125-176.
  • 10[6]BURSI J M, LAFANECHERE L, JESTIN L. Basic design studies for a 600 MW FBC boiler (270 b, 2×600 ℃)[A]. In:Robert B R, ed. Proc of the 15th Int Conf CFB[C], Georgia:Savannah, 1999:16-19.

共引文献125

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部