Wind Generation Modeling for Transmission Systems Adequacy Studies with Economic Dispatch
Wind Generation Modeling for Transmission Systems Adequacy Studies with Economic Dispatch
参考文献22
-
1R. Billinton, H. Chen, R. Ghajar, A sequential simulation technique for adequacy evaluation of generating systems including wind energy, IEEE Trans. on Energy Conversion 11 (4) (1996) 728-734.
-
2G. Papaefthymiou, P.H. Schavemaker, L. Van der Sluis, W.L. Kling, D. Kurowicka, R.M. Cooke, Integration of stochastic generation in power systems, International Journal of Electrical Power & Energy Systems 18 (9) (2006) 655-667.
-
3W. Bagen, R. Billinton, Incorporating well-being considerations in generating systems using energy storage IEEE Trans. on Energy Conversion 20 (1) (2005) 225-230.
-
4R. Billinton, G. Bai, Generating capacity adequacy associated with wind energy, IEEE Trans. on Energy Conversion 19 (3) (2004) 641-646.
-
5W. Wangdee, R. Billinton, capability and wind speed Considering load-carrying correlation of WECS in generation adequacy assessment, IEEE Trans. on Energy Conversion 21 (3) (2006) 734-741.
-
6R. Billinton, W. Wangdee, Reliability-based transmission reinforcement planning associated with large-scale wind farms, IEEE Trans. on Power Systems 22 (1) (2007) 34-41.
-
7Integrating wind: Developing Europe's power market for the large-scale integration of wind power, Trade Wind Project, EWEA, Feb., 2009.
-
8Scanner Software, software.lnformations In-house developed 1989, available online at: www.archives-suez.com/document/?f=presse/en/up1639 pdf.
-
9R. Billinton, S. Kumar, N. Chowdhury, K. Chu, K. Debnath, L. Goel, et al., A reliability test system for educational purposes-basic data, IEEE Trans. on Power Systems 4 (3) (1989) 1238-1244.
-
10H. Buyse, Electrical energy production, Electrabel, 2004 available online at www.le i.ucl.ac.be/-matagne/ELEC2753/SEM 12/S 12TR AN.PPT.
-
1K.Jafri,陈柏超,陈耀军,宋忠友.基于SVG的10kV 15电平M-STACOM的建模仿真及控制策略研究(英文)[J].高电压技术,2013,39(5):1246-1251. 被引量:6
-
2Juan Manuel Gimenez-Alvarez:,Gustavo Schweickard.Wind Generation in the Argentine Power System[J].Journal of Energy and Power Engineering,2012,6(11):1862-1868.
-
3路小娟,朱正平.基于ELM的风力发电量的预测研究[J].自动化与仪器仪表,2015(11):159-161. 被引量:2
-
4Zhang Hong,Zhao Dongmei,Li Furong,Gu Chenghong.Economic Dispatch of Smart Distribution Networks for Electricity Cost Reduction[J].Electricity,2014,25(2):15-20. 被引量:2
-
5Rene Rossi,Mohammad A.S. Masoum.Application of Wind Generation on Weak Networks Considering Potential System Limitations Due to Transients and Faults[J].Journal of Energy and Power Engineering,2012,6(5):817-825.
-
6SUDHAKARAN M.,AJAY-D-VIMALRAJ P.,PALANIVELU T.G..GA and PSO culled hybrid technique for economic dispatch problem with prohibited operating zones[J].Journal of Zhejiang University-Science A(Applied Physics & Engineering),2007,8(6):896-903. 被引量:4
-
7Rene Rossi,Mohammad A.S. Masoum.A Practical Approach Based on Equal Area Criteria for Stability Analysis of Weak Networks with Wind Generation Penetration[J].Journal of Energy and Power Engineering,2012,6(4):629-637.
-
8Tetsuo Tezuka.Evaluation of power market designs on investment incentives and capacity adequacy[J].Engineering Sciences,2008,6(2):61-68.
-
9曹瑞.差分进化算法解决电力系统经济负荷分配问题[J].中国电力企业管理,2011,0(1X):100-103. 被引量:1
-
10R. Ciprian,B. Lehman.Modeling Relative Humidity Effects on Power Electronic Performance[J].Journal of Energy and Power Engineering,2011,5(7):632-640.