期刊文献+

个旧高松矿区三维地质建模及储量估算 被引量:6

3D geological modelling and reserve calculation for Gaosong Sn ore field in Gejiu area
下载PDF
导出
摘要 文章以云南个旧东矿区高松矿田钻孔数据和勘探线地质剖面图为基础,结合中段地质平面图,以控矿条件定性分析和控矿作用定量化为导向,基于Micromine软件平台建立研究区地形、地层、断裂以及矿体的三维模型,提取地质控矿作用定量化指标,对矿区矿化分布进行不同方法的品位插值,获得已知矿体的储量计算结果。 Data are collected,such as drill holes profilgs of exploration lines geological plan of various levels for East Gejiu ore district. Based on the data the Micromine-based 3D model of topography,stratigraphy, faults and ore bodies is established and quantitative index for ore-controlling geological factors are extracted. Then the modelis used to obtain various grade interpolation and reserve calculation of the known ore bodies.
出处 《地质找矿论丛》 CAS CSCD 2011年第3期277-282,共6页 Contributions to Geology and Mineral Resources Research
基金 国家自然科学基金项目(No.40772197) 国家高技术研究发展计划863项目(No.2006AA06Z113) 教育团部创新队基金(No.IRT0755) 云南锡业集团省校合作项目联合资助
关键词 个旧高松矿区 三维地质建模 储量计算 Micromine软件 云南省 Gaosong ore field in Gejiu 3D geological model reserve calculation Micromine software Yunnan province
  • 相关文献

参考文献7

二级参考文献24

共引文献28

同被引文献86

引证文献6

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部