摘要
以阳城国际发电有限责任公司一期除灰三单元PLC控制系统升级成功为例,阐述了该厂除灰三单元5号、6号炉除灰控制系统PLC升级的原因,分别介绍了新旧PLC组成,并对升级前后的PLC硬件组成优缺点进行了比较。
Taking the successful first stage upgrade of No.3 ash handling unit’s PLC system in Yangcheng International Power Generation Co., LTD as an example, this paper expounds the reasons of the PLC upgrade of No.5 and No.6 boilers in No.3 ash handling unit, introduces the components of old and new PLC systems, and compares the advantages and disadvantages of PLC system’s hardware components before and after the upgrade.
出处
《科技情报开发与经济》
2011年第26期213-215,共3页
Sci-Tech Information Development & Economy
关键词
除灰控制系统
系统改造
PLC
硬件组成
ash handling system
system transformation
PLC
hardware components