摘要 为了求出修理工可单重休假的冷贮备系统经长期运行单位时间内的期望效益和平均停机时间,研究两不同型部件的冷贮备系统的维修更换策略。部件1有优先使用权和维修权,修理工可单重休假,利用几何过程理论和更新过程理论,以部件1的故障次数N为维修更换策略,得出系统经长期运行单位时间内的期望效益及平均停机时间的表达式,并由实例经过MATLAB仿真模拟验证其存在性与可求性。仿真试验表明:存在唯一的N*使得目标函数取得最优值。该方法对于提高企业的经济效益和大型安全性能系统合理利用资源及设备维护具有一定的指导意义和参考价值。 In order to achieve the long-term expected economic benefit and the average downtime of the system with single repairman vacation;a cold standby repairable system consisting of two-identical components was investigated in this study.Assuming that component 1 has priority in use and repair,and based on the theories of renewal process and geometric process,the breakdown times N of component 1 was used as optimal policies to obtain the expression of the long-term expected economic benefit and the average downtime of the system.Finally,a numerical example was given to illustrate some theoretical results in this paper.The simulation demonstrates that is existed.The study is useful for improving the economical performance of a company and enabling a large safety system to rationally use its resources and equipments.It is convenient for a wide application of proposed algorithm.
机构地区 燕山大学理学院
出处 《辽宁工程技术大学学报(自然科学版)》 CAS 北大核心 2011年第4期592-595,共4页 Journal of Liaoning Technical University (Natural Science)
基金 河北省教育厅基金资助项目(2007323) 全国统计科研计划基金资助项目(2010LC33)
关键词 几何过程 优先权 更换策略 期望效益 停机时间 geometric process priority replacement expected rewards average downtime
  • 相关文献

参考文献10

二级参考文献53

共引文献77

同被引文献26

  • 1魏瑛源,唐应辉.N个不同部件串联而成的M/G/1可修排队系统[J].系统工程理论与实践,2004,24(11):106-110. 被引量:9
  • 2贾积身,张秋生,李爱真.基于系统平均停机时间的维修策略研究[J].河南机电高等专科学校学报,2006,14(4):1-2. 被引量:4
  • 3贾积身,刘思峰,党耀国.修理工单重休假可修系统平均停机时间研究[J].系统工程与电子技术,2006,28(11):1770-1774. 被引量:7
  • 4贾积身,刘思峰,党耀国.修理工多重休假的可修系统更换策略[J].系统管理学报,2007,16(5):513-517. 被引量:7
  • 5Lam Y.Geometric processes and replacement problem[J].Acta Mathematicae Appliatae Shaica, 1988,4(4):366-377.
  • 6Lain Y.A note on the optimal replacement problem[J].Advances in Applied Probability,1988,20:479-482.
  • 7Zhang Y L,Wang G J.Replacement problems for a cold standby repairable system[J].International Journal Systems Science,2006,37(1): 17-25.
  • 8Zhang Y L,Wang G J.A bivariate optimal repair-replacement model using geometric processes for cold standby repairable system[J]. Engineering Optimization,2006,38(5):609-619.
  • 9Zhang Y L,Wang G J.A deteriorating cold standby repairable system with priority in use[J].European Journal of Operational Research,2007, 183(1):278-295.
  • 10Zhang Y L,Ketmg.Analysis for a two-dissimilar-component cold standby repairable system with repair priority[J].Reliability Engineering and System Safety,2011,96:1 542-1 551.

引证文献4

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部