1Al-Bahar J F, Crandall K C. Systematic Risk Management Approach for Construction Projects [J], Journal of Construction Engineering and Management, 1990, 116 (3): 533547.
2Huseby A B, Skogen S. Dynamic risk analysis: the DynRisk concept [J]. International Journal of Project Management,1992, 10 (3): 160-164.
3Ye S D, Robert Tiong L K. NPV-at-Risk Method in Infrastructure Project Investment Evaluation [J]. Journal of Construction Engineering and Management, 2000, 126 (3) :227-233.
4Chapman C B, Cooper D. Risk Engineering Basic Controlled Interval and Memory Models [ J]. J. Opl. Res. Soc.,1983, 34 (1): 51-60.
5Cooper D, Chapman C B. Control and management Risks-model, methods and cases [M]. John Wiley, UK, 1987.
6Baker S, Ponniah D, ,Smith S. Techniques for the analysis of risks in major projects [ J]. Journal of the operational research society, 1998, 49:567-572.
7Bennett J C. Bohoris G A, Aspinwall E M, Hall R C. Risk analysis techniques and their application to software development [J]. European Journal of the Operational Research,1996, 95:467-475.
8Haeura A, Haeura M J, Kocot A. Risk analysis in investment appraisal based on the Monte Carlo simulation technique[J] the European physical journal B, 2001, 20:551-553.