2×130t/h热电锅炉烟气脱硫工程调试及优化 被引量:1

Commissioning and optimization of flue gas desulfurization project in 2×130 t/h thermal boiler
下载PDF
导出
摘要 分析了2×130t/h锅炉配套石灰石—石膏脱硫系统调试过程中出现的问题,提出了解决措施并对运行参数进行了优化。结果表明,在实际工况下,燃用中低硫煤,控制吸收塔液位为7.3m,pH值为5.4,投运2台循环泵时,脱硫系统运行最为经济有效。 The problems appeared in the commissioning process of FGD system in 2×130 t/h thermal boiler were analyzed and discussed.The countermeasures were put forward.The equipments were adjusted and the operating parameters were optimized.The actual working status is at BMCR,and the coal contained little sulfur,the most economical and efficient operating parameters are were summarized as bellow:the slurry level in absorber is 7.3 m,pH value is 5.4 and only 2 pumps were employed.
出处 《电力科技与环保》 2011年第5期35-38,共4页 Electric Power Technology and Environmental Protection
关键词 烟气脱硫 调试 优化 除雾器 flue gas fesulfurization commissioning optimization mist eliminator
  • 相关文献

参考文献5

二级参考文献3

共引文献48

同被引文献1

  • 1曾庭华 杨华 王斌.湿法烟气脱硫系统的安全性及优化[M].北京:中国电力出版社,2003..

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部