施工导流方案设计是灌区改造工程建设中的重要课题,对工程施工程序和工期起决定和控制作用,其重点是如何解决灌区渠道正常供水与施工的矛盾,文章以工程实例,介绍通过钢板桩围堰等施工导流措施解决上述矛盾。
The design of construction diversion scheme is an important subject during the construction of reformation project in the irrigation area,plays the decisive and control roles in the project construction procedure and project period,and its key is how to solve the conflict between normal water supply through channels and the construction within the irrigation area.Along with an engineering case as the example,the steel-sheet pile cofferdam,as the measurement of construction diversion,is introduced to solve above conflicts in this study.