期刊文献+

丹江口水库汛期径流演变特征及趋势预测 被引量:2

Danjiangkou Reservoir Runoff Characteristics and Trends of the Wavelet Analysis
下载PDF
导出
摘要 根据丹江口水库运行调度的实践需求,采用Morlet小波函数对丹江口水库汛期的径流时间序列进行多时间尺度分析。研究表明:丹江口水库夏汛入库径流存在9年、23年、40年的主要周期;秋汛入库径流存在10年、24年、37年的主要周期;10月上旬的汛期末蓄水关键期入库径流存在9年、25年、41年的主要周期,并且在未来5年左右汛期末蓄水关键期的入库径流将处于偏丰期,夏汛和秋汛的入库径流将偏枯。本文研究成果可供丹江口水库防洪调度参考。 According to the practical needs of the operation scheduling of the Danjiangkou Reservoir,the morlet wavelet analysis is used to analyze the flood runoff time series of multiple time scales on the Danjiangkou Reservoir.Early October is the critical period at the end of flood.The critical period has a significant effect on the promotion of the reservoir.The morlet wavelet analysis shows that flood runoff in the summer of the Danjiangkou Reservior has three main periods of 9 years,23 years,40 years,flood runoff in the autumn of the Danjiangkou Reservior has three main periods of 10 years,24 years,37 years,and critical period Runoff of the Danjiangkou reservior has three main periods of 9 years,25 years,and 41 years.And in the next 5 years the end of the critical period of the runoff water will be abundant,in the side of the summer flood and autumn flood will be in the dry period.The results serve as a reference for the flood control of the Danjiangkou Reservoir.
出处 《中国农村水利水电》 北大核心 2011年第10期51-54,共4页 China Rural Water and Hydropower
基金 国家自然科学基金项目(51109224) 国家重点基础研究发展计划课题(2010CB951102) "十一五"国家科技支撑计划(2006BAB04A07) 中国水科院科研专项项目(资集1001)
关键词 丹江口水库 汛期 小波分析 趋势预测 DanjiangkouReservoir flood season wavelet analysis trend forecast
  • 相关文献

参考文献9

二级参考文献41

共引文献252

同被引文献24

引证文献2

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部