期刊文献+

大口径PCCP输水管道地基处理及关键措施 被引量:2

Treatment and Several Key Measures for Foundation of Large-diameter PCCP Water Pipeline
原文传递
导出
摘要 广州市西江引水工程主管道采用两条并行的DN3 600预应力钢筒混凝土管(PCCP),沿线多处经过软弱土层或淤泥夹砂层等不良地基。介绍了该工程所采用的有效地基处理方法及特殊地段采取的关键措施,对类似工程施工具有参考价值。 Two parallel prestressed concrete cylinder pipes (PCCP)with diameter of 3 600 mm were used as the main piping in Guangzhou Xijiang River diversion project. The layout of the pipes encountered multiple unfavorable foundation conditions (such as soft clay layer or sand-containing silt layer). Some effective methods of foundation treatment and several key measures in special areas are introduced to provide reference for construction of similar projects.
出处 《中国给水排水》 CAS CSCD 北大核心 2011年第20期5-8,共4页 China Water & Wastewater
基金 国家水体污染控制与治理科技重大专项(2009ZX07423-004)
关键词 西江引水工程 不良地基 PCCP管 地基处理 Xijiang River diversion project unfavorable foundation prestressed concrete cylinder pipe (PCCP) foundation treatment
  • 相关文献

参考文献1

二级参考文献2

共引文献4

同被引文献10

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部