摘要 为评判抽水蓄能电站库盆的渗漏量大小,提出了渗漏量分级监控指标——无故障监控指标和极限监控指标。介绍了基于综合渗透系数法和裂缝渗流法的无故障监控指标计算方法,并采用计算建筑物的排水能力来制定极限监控指标。通过具体实例阐述了分级监控指标的应用。 To evaluate the seepage at reservoir basin of pumped storage power station, monitoring indicators of two grades were advanced, i.e. faultless monitoring indicators and limit monitoring indicators. This paper, based on comprehensive permeability coefficient method and crack seepage method, introduced the calculation method for faultless monitoring indicators, as well, drainage capacity of structures was used to set the limit monitoring indicators. At last, example was presented to show the application of the monitoring indicators.
出处 《大坝与安全》 2011年第4期12-14,18,共4页 Dam & Safety
关键词 渗漏量 综合渗透系数法 排水能力 一级监控指标 二级监控指标 seepage comprehensive permeability coefficient method drainage capacity monitoring indicator of grade one monitoring indicator of grade two
  • 相关文献

参考文献2

  • 1傅志安,凤家骥.混凝土面板堆石坝[M].1992.
  • 2曹克明,汪易森,徐建军.混凝土面板堆石坝[M].2008.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部