广州地铁某暗挖隧道段基坑监测变形分析

The analysis of excavation monitoring deformation for the submarine tunnel in Guangzhou subway
下载PDF
导出
摘要 针对广州市地铁某暗挖隧道段基坑的地质情况和施工要求,制定了车站基坑监控量测方案,并对地表下沉,地表建筑物下沉及倾斜,暗挖隧道拱顶下沉,暗挖隧道净空水平收敛,钢拱架钢筋应力及爆破震动效应进行了监测分析,以便及时掌握开挖支护期间结构的稳定性及施工期间对周围环境的影响。 According to the geological situation and the demand of the construction for the submarine tunnel in Guangzhou subway, the scheme of supervision and measurement for station excavation is made. Surface subsidence, inclined and subsidence of surface buildings, vault crown settlement and horizontal clearance convergence of mined tunnel, steel stress and blasting vibration effect of the steel arch is monitoring analyzed, so as to timely grasp the stability of the structure during excavation and the impact of construction on surrounding environment.
作者 陈亮
出处 《山西建筑》 2011年第31期167-169,共3页 Shanxi Architecture
关键词 暗挖隧道 基坑工程 监测 变形分析 mined tunnel, foundation pit engineering, monitoring, analysis of deformation
  • 相关文献

参考文献6

  • 1DBJFFl5-20-97.建筑基坑支护工程技术规程[S].[S].,1998..
  • 2GJB02-98.广州地区建筑基坑支护技术规程[S].[S].,1998..
  • 3JGJ120-99.建筑基坑支护工程技术规程[S].[S].,..
  • 4JGJ8-97.建筑变形测量规程[S].
  • 5GB50026-93.工程测量规范[S].[S].,..
  • 6李玉磊.宝天曼隧道施工监控量测分析研究[J].山西建筑,2010,36(21):313-314. 被引量:1

二级参考文献1

共引文献182

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部