摘要
通过由列车装载的集装箱流在到达铁路集装箱中心站以后对转运作业系统进行物流过程分析,在综合运用系统方法基础上研究转运设备的优化配置情况,使作业效率达到最大化。所使用的研究方法为铁路集装箱物流中心站的有关决策问题提供一定的理论帮助。
The paper applies logistics process analysis on trans fe r operating system after the container train arrives at the railway container ce nter station,and studies the optimal allocation of transfer equipment based on integrated use of system approaches,maximizing the operating efficiency.The em ployed study methods provide certain theoretical help for decision-making of ra ilway container logistics center station.
出处
《起重运输机械》
2011年第10期9-15,共7页
Hoisting and Conveying Machinery
关键词
铁路集装箱
转运作业
系统分析方法
设备优化配置
railway container
transfer operation
system analysis method
equipment optimal allocation