期刊文献+

一字形剪力墙特例的概念设计误区与SATWE及高规改进

Erroneous zone on conceptual design about exceptional case of unmoral straight shear-wall,and the improvement on the SATWE software & technical specification for concrete structure of tall building
下载PDF
导出
摘要 以广东省东莞码头一例工作塔结构为例,对比讨论了四角一字形剪力墙布置、四角L形全短肢剪力墙(1.5 m)布置、四角L形短长肢剪力墙布置(、D)轴剪力墙布置几种方案的选择,介绍了一字形剪力墙布置特例危楼疑问,指出了四角一字形剪力墙布置方案在传力途径上尚有较大漏洞,非常规结构布置的特例容易出结构体系问题,从而提出了混凝土高层建筑剪力键、压力键、拉力键的设计等结构新概念,进而达到优化SATWE电算及高规的设想。 Some special case,such as inappropriate arrangement of straight("一" font) shear-wall,straight("L" font)full short shear-wall,straight("L" font) shear-wall,and shear-wall on D axis,are discussed,based on actual project with a working tower of Dongguan pier of Guangdong Province.New structure concepts for concrete tall building,such as shearing force connector,are proposed,based on actual project with the dangerous building queries in a special case,cased by inappropriate arrangement of straight("一" font) shear-wall,through which will result in mistakes.Then,the new optimization ideas about the SATWE software "technical specification for concrete structure of tall building" are suggested.
出处 《四川建筑科学研究》 北大核心 2011年第5期34-38,共5页 Sichuan Building Science
基金 重庆市科委自然科学基金资助项目(CSTC 2006BB0128)
关键词 结构概念设计 剪力键 压力键 拉力键 一字形剪力墙 conceptual design for structure shearing force connector pressure force connector pulling force connector strait("一" font) shear-wall
  • 相关文献

参考文献1

  • 1JGJ3-2002高层建筑混凝土结构技术规程[S].北京:中国建筑工业出版社,2002.

共引文献285

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部