期刊文献+

三塔结合梁斜拉桥空间有限元模型对比分析 被引量:2

Comparative Analysis of the Spatial FEM Model of Composite Girder Cable-stayed Bridge with Three Towers
下载PDF
导出
摘要 斜拉桥复杂的超静定结构形式增加了其结构分析的难度,模型分析结果与实际结构测量结果之间总是存在一定的误差。传统的建模方法是对主塔、斜拉索和主梁进行大量的简化,用梁单元和杆单元来建立平面或空间的杆系模型,误差较大。本文针对武汉二七长江大桥,通过ANSYS有限元软件,采用空间板壳和实体单元与梁单元相结合,建立其精细化空间有限元模型,分析该桥的空间内力分布及变形特征,同时建立其简化单主梁模型进行对比分析,分析结果表明,精细化有限元模型不仅能更为准确的模拟实桥的空间受力状态,给出主梁各处沿横向的位移及内力分布,并且能实现准确的实桥运营阶段结构分析,本文分析结果对该类大跨径桥梁具有一定的借鉴作用。 Because of the complex statically indeterminate structure form of cable-stayed bridge,structural analysis becomes more difficult.There are always some errors between the model analysis results and the real structure measured results.Tra ditional modeling method was to simplify the bridge tower,stay-cable and girde r in large quantity,and establish the planar or spatial frame model with beam a nd bar element.In this paper,a refined FEM spatial model of Wuhan erqi changji ang river bridge was established with space shell,solid and bar element through finite element software of ANSYS.Then the space internal force distribution an d deformation feature of this bridge were analyzed.Moreover,a simplified singl e-girder model was established to make comparative analysis.The results reveal ed that the refined FEM model can not only simulate the space force state of the real bridge more accurately and give the transverse displacement and internal f orce distribution of the beam but also analyze the real structure in the service stage accurately.The analysis results in this paper have some reference functi on for this long-span bridge.
出处 《土木工程与管理学报》 2011年第3期164-168,共5页 Journal of Civil Engineering and Management
基金 武汉市科技攻关项目(201160923308) 武汉市建设科技项目(200923)
关键词 斜拉桥 超静定 精细化 单主梁 有限元模型 cable-stayed bridge statically indetermina te refinement single-girder finite element model
  • 相关文献

参考文献9

二级参考文献28

  • 1[1]YIU P,BROTTON D M.Computation of Fabrication Dimensions for Cable-Stayed Bridges[J].The Structure Engineer,1988,66(15):200-243.
  • 2[2]LEVINSON D A,KANE T R.A Usable Solution of the Hanging Cable Problem[J].Computers and Structures,1993,46(5):800 -844.
  • 3[5]Wang PH,Yang CG.Parametric studies on Cable-Stayed Bridges.Computers and Structures,1996,60(2):243-260.
  • 4[7]Pao-Hsii Wang,Hung-Ta Lin,Tzu-Yang Tang.Study on nonlinear analysis of a highly redundant Cable-Stayed Bridges,Computers and Structrues,2002,80:165-182.
  • 5Rito A. Aesthetics and bridge design. Structural Engineering International, 1992 ; 6(2) : 91--92.
  • 6Troyano L F,Armisen J M ,Suarez M A A. The inclined towers of the Ebro and Lerez bridge. Structural Engineering International, 1998 : 8 (4) : 258--260.
  • 7Takenouchi K. Single pylons for curved cable-stayed bridges. Structural Engineering International, 1998; 8 (4) :269--272.
  • 8Kominek M. The Marian bridge,Czech Republic. Structural Engineering International, 1998 : 8 (4) : 283--284.
  • 9Casa J R. Full scale dynamic testing of the Alamillo cable--stayed bridge in Sevilla (Spain). Earthquake Engineering and Structural Dynamics, 1995 : 24 (1) : 35--51.
  • 10Tan S C. Safti Link Bridge, design and construction. Defence Technology Group Seminars Aeries, Ministry ofDefense, Singapore, 1996 : 1--4.

共引文献155

同被引文献11

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部