期刊文献+

基于IDA和纤维模型的高墩大跨连续刚构桥梁地震反应分析 被引量:4

Study on Seismic Vulnerability of Long-span Continuous Rigid Fr ame Bridge with High Pier
下载PDF
导出
摘要 基于纤维模型的有限元方法,建立了典型高墩大跨连续刚构桥的非线性数值分析模型。采用动力增量分析法,即IDA方法对结构进行了非线性动力时程分析,分别探讨了在纵桥向和横桥向地震作用下高墩连续刚构桥梁结构的破坏规律、最大位移和最大曲率的关系,高阶振型效应对高墩大跨连续刚构桥墩身内力和变形的影响及位移和曲率沿墩高变化的规律。 Based on the fiber model,the typical nonlinear numerical analysis model of long-span continuous rigid frame bridge with high pier is presented.IDA method is adopted for the nonlinear dynamic history analysis for the structure.The failur e law and the relationship between maximum displacement and maximum curvature of the element are discussed under earthquake in longitudinal and transversal dire ction respectively.The internal force and deformation of piers,affecting by th e high order vibration,and the displacement and curvature along the high of pie r are studied.
作者 谷音 卓卫东
出处 《土木工程与管理学报》 2011年第3期235-240,共6页 Journal of Civil Engineering and Management
基金 福建省自然科学基金(2010J01287)
关键词 高墩大跨连续刚构桥 IDA方法 损伤指标 纤维模型 long-span continuous rigid frame bridge with high pier IDA method damage index fiber model
  • 相关文献

参考文献7

二级参考文献32

共引文献108

同被引文献32

  • 1徐艳,胡世德.钢管混凝土拱桥弹性动力稳定性能研究[J].地震工程与工程振动,2006,26(4):162-167. 被引量:8
  • 2徐艳,胡世德.地震作用下钢管混凝土拱桥的动力稳定性[J].同济大学学报(自然科学版),2007,35(3):315-319. 被引量:13
  • 3Dieber D G,Wacker J M.Precast concrete pier sys-tems for rapid construction of bridges in seismic re-gions[R].Washington DC:University of Washington,2005.
  • 4Ikeda S.Seismic behavior of reinforced concrete col-umns and improvement by vertical prestressing[C] ∥Proceedings of the 13th FIP Congress on Challenges forConcrete in the Next Millennium:Amsterdam.Rot-terdam:A.A.Balkema,1998.
  • 5Zatar W A MH.Reduced residual displacements ofpartially prestressed concrete bridge piers[C] ∥12thWorld Conference on Earthquake Engineering.Auck-land:Upper Hutt,2000.
  • 6Kwan W P,Billington S.Unbonded posttensionedconcrete bridge piers.Ⅰ:monotonic and cyclic analy-ses[J].Journal of Bridge Engineering,ASCE,2003,8(2):92-101.
  • 7Kwan W P,Billington S.Unbonded posttensionedconcrete bridge piers.Ⅱ:seismic analyses[J].Journalof Bridge Engineering,ASCE,2003,8(2):102-111.
  • 8Iemura H,Takahashi Y,Sogabe N.Development ofunbonded bar reinforced concrete structure[C] ∥13thWorld Conference on Earthquake Engineering.Van-couver:[s.n.] ,2004.
  • 9de Felice G.Assessment of the load-carrying capacityof multi-span masonry arch bridges using fibre beamelements[J].Engineering Structures,2009,31(8):1634-1647.
  • 10Wang H L,Wang H,Qin S F,et al.Seismic analysisof prestressed bridge pier based on fiber section[J].Procedia Engineering,2011,21(10):354-362.

引证文献4

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部