摘要 以马钢大H型钢厂轧后冷却项目回水池工程为实例,介绍了如何在周边环境复杂,无法放坡开挖的情况下,利用结构自身强度以及与土体的摩擦力逆作法施工,进行土方直立开挖,并取得了良好的经济效果,可在工程实践中参考应用。 Taking water recycling tank project for cooling of Masteel heavy H- beam steel rolling as example, under the complicated circumstance that the slope excavation is not allowed, the method of reverse process construction making use of structural strength of itself and friction force of soil is adopted to conduct earthwork excavation of vertical, which achieves good economic results and can be taken as reference for the application in the engineering practice.
作者 张永利
出处 《安徽冶金科技职业学院学报》 2011年第4期33-36,共4页 Journal of Anhui Vocational College of Metallurgy and Technology
关键词 逆作法 直立开挖 矩形地下水池 Reverse Process Construction Earthwork Excavation of Vertical Rectangular Underg- round Water Pool
  • 相关文献

参考文献3

  • 1建筑基坑支护技术规程(JGJl20-99).
  • 2建筑基坑工程检测技术规范(GB50497-2009).
  • 3俞宾辉.建筑地基与基础施工手册[M].北京:中国建筑工业出版社,2005.6.

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部