大跨径连续箱梁悬臂施工有限元仿真分析

Finite Element Simulation Analysis of Force Conditions of Large Span Continuous Box Girder Bridge with Cantilever Construction
下载PDF
导出
摘要 采用Midas/Civil 2006将全桥结构简化为三维空间模型结构,可实现桥梁从施工到成桥全过程的受力仿真分析.结合跨越既有线(70 m+125 m+70 m)连续箱梁桥,介绍对其仿真分析的方法.计算结果表明有限元分析方法能精确地模拟结构实际受力全过程,为连续梁桥的施工及测控提供有参考依据和有效的验证手段. By means of Midas/Civil2006 software, the whole bridge can be simplified into three-dimensional model, the simulation analysis of the whole process of bridge froce conditions from construction state to completion state can be performed. The large span continuous box girder with the span of 70m + 1250 + 70m which crosses the existing railroad was analyzed. The results of calculation show that the method can well fulfill precise simulation of the whole process of the actual force conditions of the structure of the bridge, therefore contributing an effective means of verifying construction and supplying technical data for the similar large span continuous box girder.
作者 胡娟
出处 《兰州工业高等专科学校学报》 2011年第5期57-60,共4页 Journal of Lanzhou Higher Polytechnical College
关键词 连续箱梁 悬臂施工 有限元分析 continuous box girder cantilever construction finite element analysis
  • 相关文献

参考文献5

二级参考文献5

共引文献543

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部