摘要
结合上海轨道交通2号线东延伸接驳工程的实践,从接轨线路、结构改造、机电改造等方面介绍了接驳工程方案。分析了工程实施过程中的难点与重点,并编制详细的接驳工序。总结接驳工程实施过程中的经验,提出了完善接驳工程的建议。
Combined with the connecting project on the East Extension of Shanghai rail transit Line 2, this paper introduces this project including the junction lines, structural reform and electromechanical equipments, analyzes the Gordian knots in the engineering, and summarizes the experiences of the connecting project,so as to provide some relatively mature proposals for the connecting project.