期刊文献+

耦合型公共事务重叠执行周期研究——一个双向信息交流的分析视角 被引量:1

Study on Overlapping Execution Cycle of Coupling Public Affairs——From the Perspective of Two-way Information Communication
下载PDF
导出
摘要 为研究信息双向交流对耦合型公共事务重叠执行周期的影响,将信息交流过程划分为重叠前、重叠和重叠后三个阶段,利用信息进化度表示重叠开始时刻和迭代结束时刻不发生信息更改的概率,利用公共事务转移矩阵研究发生信息更改时的公共事务调整量。基于此,文章建立基于双向信息交流的耦合型公共事务重叠执行周期模型,并分析发生信息更改的概率和公共事务调整量与执行周期的关系。 To explore the impact of two-way information communication on overlapping execution cycle of coupling-tasks, information communication is divided into three stages, such as pre-overlapping, overlapping and post-overlapping. The information evolution function is established to represent the probability of design change at start time of overlapping and end moment of iteration. The amount of task adjustment caused by design change is denoted by task transition coefficient. Based on the above, the model of overlapping execution cycle of coupling-tasks is established under the two-way information communication, and the relationship between probability of design change and execution cycle is also analyzed.
作者 曹永森
出处 《华东经济管理》 CSSCI 2011年第12期96-98,共3页 East China Economic Management
基金 国家社会科学基金青年项目(07CZZ014) 中国博士后基金一等资助项目(20090450143) 江苏省博士后基金资助项目(0901115C)
关键词 耦合型公共事务 重叠方式 双向信息交流 执行周期 coupling-task overlapping two-way information communication execution cycle
  • 相关文献

参考文献11

  • 1许多,严洪森.并行产品开发过程的时间模型及其优化方法[J].机械工程学报,2006,42(1):23-29. 被引量:13
  • 2Krishnan V, Eppinger S D, Whitneyd E. A model-based framework to overlap product development activities[J]. Man- agement Science, 1997, 43(4) :43-45.
  • 3Yassine A A, Chelst K R, Falkenburg D R.A decision analyt- ic frame-work for evaluating concurrent engineering [J]. IEEE Transaction on Engineering Management, 1999, 46(2): 144-147.
  • 4Loch C H, Terwiesch C. Communication and uncertainty in concurrent ngineering [J]. Management Science, 1998, 44 (8) : 1032-1048.
  • 5Calantone R J, Di Benedetto C A. Performance and time-to-market: accelerating cycle time wit h overlapping stages [J]. IEEE Transactions on engineering Management, 2000,47(2): 232-244.
  • 6Roemer T A, Ahmadi, Wang R H. Time-cost trade-offs in overlapped product development [J]. Operations Research, 2000, 48(6) : 858-865.
  • 7马文建,刘伟,李传昭.并行产品开发中设计活动间重叠与信息交流[J].计算机集成制造系统,2008,14(4):630-636. 被引量:26
  • 8王志亮,张友良.耦合任务的重叠执行问题研究[J].计算机集成制造系统,2006,12(6):947-954. 被引量:12
  • 9陈庭贵,肖人彬.产品开发的多输入多输出活动重叠模型研究[J].计算机集成制造系统,2008,14(2):255-261. 被引量:8
  • 10Terwiesch C, Loch C H, De Meyer A. Exchanging prelimi- nary information in concurrent engineering: alternative coor- dination strategies [J]. Organization Science, 2002, 13(4): 402-419.

二级参考文献51

共引文献42

同被引文献6

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部