阿达水库位于引水隧洞的起点,地处雅砻江上游的高山峡谷区,是南水北调西线一期工程中大型水库之一。水库建成后,将产生一系列环境工程地质问题,从库区地质背景出发,对阿达库区产生的环境工程地质问题进行了初步分析。
Ada reservoir,one of the large reservoirs in the first phase of west route of South-to-North Water Transfer Project,located in the upper reaches of the Yalong River Gorge area,is the starting point of a diversion tunnel.After the impoundment of the reservoir,a series of environmental engineering geological problems may occur.Based on geological background of the reservoir,preliminary analysis of the potential environmental geological problems is made.
出处
《资源环境与工程》
2011年第5期438-440,共3页
Resources Environment & Engineering
关键词
环境工程地质
水库渗漏
水库淤积
诱发地震
environmental engineering geology
reservoir leakage
reservoir sedimentation
induced earthquake