期刊文献+

基于遗传算法的编队条件下舰船修理周期结构优化 被引量:9

Periodical Structure Optimization of Fleet-Wide Ship Repair by Genetic Algorithm
下载PDF
导出
摘要 舰船的部署和修理活动在全寿命期内是按其修理周期结构进行,而编队的使用则需要编队内各舰艇的修理周期结构的相互配合,通过组合优化各舰艇的修理周期结构,可以使编队拥有更多的部署时间。在舰船修理周期结构的定量描述模型基础上,构建了编队的修理调度模型,并采用遗传算法对编队的部署能力进行了优化分析。实例分析结果表明:优化后编队的部署时间可达到近110个月,相对于未优化前提高了50个月。 Ship deployment and repair activities should be managed in accordance with its own periodical repair structure throughout the life span of ship,however,for the fleet-wide repair activities,it must be carried out under the guidance of the periodical repair structure of other ships in the fleet,that is to say,the repair should proceeds in concert with the other ship repair schedule,so as to expand the deployment period of fleet by obtaining optimal periodical repair structures of all ships.Quantitatively modeling the periodical structure for ship repair,a repair scheduling model was established to optimize the deployment capability of fleet by the use of genetic algorithm.The analyses of examples show that the deployment period of fleet will be expanded up to 110 months based on the optimal periodical repair structure,50 months longer than that without optimization.
出处 《中国舰船研究》 2011年第5期103-107,共5页 Chinese Journal of Ship Research
关键词 修理 周期结构 编队 部署能力 遗传算法 repair and maintenance periodical structure fleet deployment capability genetic algorithm(GA)
  • 相关文献

参考文献10

  • 1张涛,朱晓军,彭飞.编队作战需求下舰船修理周期结构的优化[J].中国修船,2011,24(4):51-55. 被引量:4
  • 2Chief of Naval Operation. Representative intervals, dura- tions, maintenance cycles, and repair mandays for depot level maintenance availabilities of U.S. navy ships [R]. OPNAV Notice 4700,June 13,2005.
  • 3JACOBS K S, ROBERT L C. The maintenance require- ments system : risk-based resource planning comes of ages [C ]//American Society of Naval Engineers Conference, 2001.
  • 4ROLAND J Y,JAMES G K,JOHN F S,et.al. Increasing aircraft carrier forward presence: changing the length of the maintenance cycle[R]. RAND, 2008.
  • 5MATrHEW H H, MATTHEW W C. The impact of long- team aircraft carrier maintenance scheduling on the fleet readiness plan [D ]. Naval Postgraduate school, Monterey, California, 2004,9.
  • 6ROLAND J Y,JOHN F S,JAMES G K. Aircraft carrier maintenance cycles and their effects[R]. RAND ,2008.
  • 7ROLANDLY J Y,RAJ R,JESSIE R. Impacts of the fleet response plan on surface combatant maintenance [R]. RAND, 2006.
  • 8刘国华,包宏,李文超.用MATLAB实现遗传算法程序[J].计算机应用研究,2001,18(8):80-82. 被引量:62
  • 9ROLAND J Y,JOHN F S,JAMES G K. A methodology for estimating the effect of carrier operational cycles on the maintenance industrial base[R]. RAND,2007.
  • 10夏华波,纪卓尚,张明霞.改进遗传算法在驳船配载中的应用[J].中国舰船研究,2010,5(6):51-55. 被引量:7

二级参考文献19

共引文献70

同被引文献54

引证文献9

二级引证文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部