摘要
主要介绍国华宁海电厂2×1000MW超超临界燃煤机组协调控制(CCS)原理、协调回路的构成及相关的逻辑关系;分析了调试过程中出现的一些故障原因、处理过程及协调优化改进的措施。
This article main contained Coordinate control system(CCS) of Guohua power generation in Ninghai 2×1000MW Units;The consist of Coordinate control system Loop and the logic relation of the CCS.This article also main contain some questions about the debugging oF Ninghai Power generation、the treatment process of the debugging and the improvement of the Coordinate control system.
出处
《制冷空调与电力机械》
2011年第5期85-88,共4页
Refrigeration Air Conditioning & Electric Power Machinery