期刊文献+

鄂东大桥混合梁斜拉桥合龙技术 被引量:8

Closure technique for the hybrid girder cable-stayed bridge of Edong Bridge
下载PDF
导出
摘要 结合世界第二混合梁斜拉桥——主跨926 m的鄂东大桥,研究了大跨径混合梁斜拉桥中跨合龙方案的影响因素及关键技术,确定采用加载合龙方案。加载合龙方法具有较好的温度适应性,对成桥结构线形和受力影响很小,满足无应力施工控制方法的要求,适用于大跨径混合梁斜拉桥。研究成果及实践经验对同类型桥梁具有借鉴指导意义。 Based on Edong Bridge,which is the second longest hybrid girder cable-stayed bridge with 926 m long main span,the influencing factors and crucial techniques of the main span closure method for long span hybrid girder cable-stayed bridge are studied.After theoretical analysis,numerical evaluation and practical test,the loading assistant closure method is employed in Edong Bridge.The loading assistant closure method,with better thermal adaptability and less influence on bridge line and the forced status,can meet the requirements of the unstressed state control method.Based on the mentioned advantages,the loading assistant closure method is applicable to long span hybrid girder cable-stayed bridges.The conclusion can provide reference for the further design of the similar bridges.
出处 《中国工程科学》 2011年第10期99-104,共6页 Strategic Study of CAE
关键词 鄂东大桥 混合梁斜拉桥 合龙技术 加载合龙 无应力状态控制法 Edong Bridge hybrid girder cable-stayed bridge closure technique loading assistant closure method unstressed state control method
  • 相关文献

参考文献7

二级参考文献35

共引文献244

同被引文献51

引证文献8

二级引证文献58

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部