摘要
由于内外各种因素的影响,大坝安全监控参数会随时间而变化,而常规监控模型常常采用非时变的参数。基于主成分分析,利用缩减后的主成分荷载建立了时变预测模型。实例表明,该模型可以减少计算时间,有效削弱因子多重相关性的影响,提高大坝监测效应量的预测水平。
As influenced by many internal and external factors, the dam safety monitoring parameters will change over time, and the time-invariant parameters arc often used in conventional monitoring models. Based on principal component analysis, a time-varying prediction model is set up by using reduced principal component loads. The case studies show that the model can save computational time, weaken muhi-correlativity among factors and improve the effect size prediction of dam monitoring.
出处
《水力发电》
北大核心
2011年第10期100-103,共4页
Water Power
关键词
大坝安全监控
数学模型
主成分分析
时变参数
dam safety monitoring
mathematical model
principal component analysis
time-vat,ring parameter