摘要
建设工程的前期是进行建设工程总体成本控制的关键时期,其成本控制的重点在于进行工程投资估算、可行性报告和设计阶段。因此建设工程前期进行成本控制的举措在于加强与设计单位的沟通与协作,既保证工程施工技术,又保证工程造价。
It is the key to do cost control of construction engineering in the early period. The key points of cost control are to do project investment estimation, feasibility report and design. So the cost control measures in the early period of construction project is to strengthen the communication and cooperation with the design unit, which not only ensure project construction technology, but ensure the engineering cost.
出处
《价值工程》
2011年第32期72-72,共1页
Value Engineering
关键词
建设工程前期
成本控制
earlier stage of construction project
cost control