摘要
结合具体工程实例,对7.63 m焦炉抵抗墙施工工艺进行了介绍,分别阐述抵抗墙钢筋工程、模板工程及混凝土工程三方面施工技术和操作要点,并对模板加固计算方法作了简要说明,以期指导今后同类项目工程。
Combining with the factual examples,the paper introduces the construction craft of the 7.63-meter resistance wall of coke ovens,illustrates the construction technique and operation points for the reinforced projects,the model projects and the concrete projects of the resistance walls,and indicates the calculation methods for the model consolidation,so as to direct the future similar projects.
出处
《山西建筑》
2011年第32期90-91,共2页
Shanxi Architecture
关键词
焦炉
抵抗墙
施工工艺
模板
coke oven
resistance wall
construction craft
model