摘要
就目前核电发展与电网的关系,开展了核电机组核岛侧负荷跟踪能力以及核功率分布情况的分析和仿真,根据仿真结果提出了在核电机组具有负荷跟踪的前提下,从核电站反应堆核功率的分布情况,确保反应堆的安全性,为压水堆核电站对电网自动发电控制的适应性研究提供了理论依据和可行的手段。
The relationship between the nuclear power development and grid installation is presented, and analysis and simulation to the nuclear power reactor side load tracking ability and nuclear power distribution are launched. According to the simulation results, a proposal method is suggested to track the nuclear power distribution when nuclear power units possess load tracking ability so as to ensure the safety of the reactor and thus to provide theoretical basis and feasible method for the adaptability of PWR nuclear power to the grid automatic generator control.
出处
《华东电力》
北大核心
2011年第10期1744-1746,共3页
East China Electric Power
关键词
自动发电控制
压水堆
反应堆功率分布
梯形图
automation generator control (AGC)
pressed water reactor (PWR)
nuclear power distribution
ladder diagram