摘要
对安图县西江水电站工程项目设计进行了论述并对其在建成后所产生的经济效益进行了综合评价,西江水电站在经济上合理,财务上可行,其各项经济财务指标均较优越,宜尽早立项建设。
Xijiang hydropower station project design in Antu County is discussed and the economic benefits after its completion are evaluated comprehensively. Xijiang hydropower station is reasonable in economy, and is viable in finance, and its economic and financial index is superior, which should be constructed as soon as possible.
出处
《价值工程》
2011年第33期54-54,共1页
Value Engineering
关键词
水电站
工程项目
设计
经济评价
方案
hydropower station
engineering project
design
economic evaluation
scheme