摘要 工程高边坡在开挖过程中由于卸荷变形等因素,整体稳定性受长大裂隙控制。通过对长大裂隙的调查描述,建立二维及三维地质模型,在定性评价的基础上进行定量计算,并进行分析,对边坡的稳定性进行评价和预测,研究结果对类似高边坡稳定性研究具有借鉴意义。 The overall stability of a project high slope is controlled by large long fissures due to unloading deformation during excavation.Through investigation of the large long fissures and establishment of 2D and 3D geological models,and making quantitative calculation and analysis,the slope stability is evaluated and forecast.The results can be referred to for stability study of similar high slopes.
出处 《西北水电》 2011年第5期14-16,29,共4页 Northwest Hydropower
关键词 边坡 卸荷裂隙 稳定性 敏感性 slope unloading fissures stability sensitivity
  • 相关文献

参考文献2

二级参考文献12

共引文献5

同被引文献33

  • 1张文阁.深水河不良地质钻孔灌注桩的施工[J].辽宁交通科技,2005,28(5):61-62. 被引量:1
  • 2苏永华,赵明华,邹志鹏,欧阳光前.边坡稳定性分析的Sarma模式及其可靠度计算方法[J].水利学报,2006,37(4):457-463. 被引量:31
  • 3DL/T5353-2006,水电水利工程边坡设计规范[S].北京:中国电力出版社,2007:55-57.
  • 4中国水电顾问集团西北勘测设计研究院.金沙江鲁地拉水电站可行性研究阶段设计报告[R].2005.
  • 5刘俊民.工程地质与水文地质[M]北京:中国农业出版社,2004.
  • 6冯志荣;孙云博;白志强.三河口水库地质勘察报告[R]咸阳:陕西省水电勘察设计院地勘分院,2005.
  • 7曾佐勋;樊克明.构造地质学[M]武汉:中国地质大学出版社,2008.
  • 8王耀德.工程地质与水文地质[M]北京:中国水利水电出版社,1995.
  • 9金沙江向家坝水电站左岸主体及导流工程施工招标文件工程地质参考资料[R].长沙:中国水电顾问集团中南勘测设计研究院,2005.
  • 10金沙江向家坝水电站二期工程坝基处理专题研究报告[R].长沙:中国水电顾问集团中南勘测设计研究院,2009.

引证文献6

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部