期刊文献+

基于VMI管理策略的集配中心物流分析 被引量:1

Distribution Logistics Analysis Base on VMI Management Strategy
下载PDF
导出
摘要 随着全球经济一体化的推进,越来越多的企业将集配中心的管理作为一种新的管理理念,而优化和集成是分销管理的核心。其中,基于VMI管理策略的库存协调是制造商与各零售商进行协同管理的重要组成部分和成功实施的关键因素。VMI管理策略有利于降低大型制造商和零售商的库存成本,缩短交货提前期,实现大型制造与零售商的企业群之间的协同作业,即分散决策和集中决策情形下分别进行了讨论,重点分析了集配中心的营运主体、角色定位和功能范围等。 With the advance of global economic integration,more and more enterprises will be set with the center's management as a new management philosophy,and distribution management optimization and integration is the core.Among them,the inventory management strategy based on coordination of VMI is the retailers,manufacturers and an important part of collaborative management and successful implementation of the key factors.VMI management strategy is conducive to large manufacturers and retailers to reduce inventory costs,shorten delivery lead time,to achieve large-scale manufacturing and retail business collaboration between groups that focus on decentralized decision-making and decision-making situations are discussed,respectively,focused on analyzing the operation of the main set with the center of its role and function of range.
作者 吴慧聪
出处 《物流工程与管理》 2011年第10期102-104,共3页 Logistics Engineering and Management
关键词 VMI sale-hub 物流分析 VMI sale-hub logistics analysis
  • 相关文献

参考文献5

二级参考文献23

  • 1赵林度,李时伟.VMI实现模式研究[J].中国管理科学,2000,8(S1):124-130. 被引量:29
  • 2Barnes E, Dai J,Deng Shijie. On the strategy of supply hubs for cost reduction and responsiveness [R]. singapore: National University of Singapore, 2000.
  • 3Hahm J,Yano C A. The economic lot and delivery scheduling problem: the single item case[J]. International Journal of Production Economics, 1992,28(2) : 235-252.
  • 4Hahm J, Yano C A. Economic lot and delivery scheduling problem:the common cycle case [J]. IIE Transactions, 1995, 27 ( 2 ) : 113- 125.
  • 5Hahm J, Yano C A. Economic lot and delivery scheduling problem: the nested schedule case[J]. IIE Transactions, 1995, 27(2) : 126-139.
  • 6Khouja M. The economic lot and delivery scheduling problem: common cycle, rework, and variable production rate [J]. IIE Transactions, 2000,32(8) :715-725.
  • 7Clausen J,Ju S. A hybrid algorithm for solving the economic lot and delivery scheduling problem in the common cycle case [J]. European Journal of Operational Research, 2006,175 ( 2 ) : 1141- 1150.
  • 8Elizabeth F V, Nhouja M, Michalewicz Z. An evolutionary algorithm for optimizing material flow in Supply chains [J]. Computers Industrial Engineering, 2002,43 (3) :407-421.
  • 9Khouja M. Synchronization in supply chains: implications for design and management [J ]. Journal of the Operational Research Society,2003,54(9) :984-994.
  • 10Pundoor G. Integrated production-distribution scheduling in Supply chains[D]. Maryland:University of Maryland, 2005.

共引文献60

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部