深大异步联合基坑支撑优化及实测分析 被引量:5

Optimization Design and Monitoring Analysis for Great Asynchronous Combined Excavation
下载PDF
导出
摘要 对某深大异步联合基坑工程进行计算分析,并从安全、经济及施工的角度对多个方案进行比选;对该工程交界面处实测结果进行了有针对性的分析,得到该区域深层水平位移及内支撑轴力在空间上的变化规律:深层水平位移接近零点与开挖深度之比约为1.6;深层水平位移累计量随交界面距离的增大而减小,影响范围约为开挖面高差的2倍;异步开挖对内支撑轴力影响不明显。该结论可为此类工程提供参考。 A detailed introduction of great asynchronous combined excavation is given.The calculation and scheme comparison are made from the points of safety,economy and being easy for construction.The monitoring analysis on juncture is made with clear target,and the variations of deep horizontal displacement and supporting forces are obtained.The results show that the ratio of zero-point of deep horizontal displacement to excavation depth is close to 1.6,the accumulative value of deep horizontal displacement would decrease with the increasing of horizontal distance,the influence scope is about 2 times of height difference,and the influnce to supporting forces is not obvious.The research rusults are useful to similar engineerings.
出处 《水利与建筑工程学报》 2011年第5期91-95,共5页 Journal of Water Resources and Architectural Engineering
关键词 深大基坑 异步 联合 支撑优化 监测 great excavation asynchronism combination supporting optimization monitoring
  • 相关文献

参考文献9

二级参考文献42

共引文献737

同被引文献14

引证文献5

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部