云广±800kV直流输电工程调试中过电压测试技术分析 被引量:3

Summarization of Over-voltage Test Technology in Commissioning of Yun-Guang ± 800 kV DC Transmission Project
下载PDF
导出
摘要 云南至广东±800kV直流输电工程是世界上首个特高压直流输电工程,对该工程调试过程中的交直流侧滤波器、交流侧换流变压器过电压测试技术和调试经验进行总结,从调试项目的设置、调试方法和验收标准等方面,对该工程与±500kV直流输电工程在站调试和系统调试中的过电压测试技术进行分析比较,指出调试中应注意的问题,提出进一步优化和细化调试安全管理模式、大幅缩短试运行时间等建议。 ± 800 kV DC transmission project from Yunan to Guangdong is the first UHV DC transmission project in the world, in the commissioning process of which, over-voltage test technology and commissioning experience of filters at both AC and DC sides and converter transformer at AC side are summarized. Over-voltage test technologies between station commissioning and system commissioning of the project and ± 500 kV DC transmission project are comparatively analyzed in re- spect of setting of commissioning project, commissioning method and acceptance standards. Attentions in commissioning are indicated and suggestions such as further optimization and division of commissioning safety management mode and drastic shortening of time of test run are made.
出处 《广东电力》 2011年第9期58-62,共5页 Guangdong Electric Power
关键词 特高压直流输电 站调试 系统调试 过电压测试 UHV DC transmission station commissioning system commissioning over-voltage test
  • 相关文献

参考文献9

二级参考文献31

共引文献224

同被引文献18

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部