摘要
主要介绍了灌注桩水下砼灌注施工环节中常见的质量通病,与此提出了相应的预控措施。
A presentation at the common problems of construction quality during the process of concreting bored pile underwater and puts forward the corresponding pre-control measures.
出处
《山西冶金》
CAS
2011年第5期66-67,69,共3页
Shanxi Metallurgy
关键词
水下砼灌注
施工
质量控制
underwater concrete pouring
construction
quality control