期刊文献+

轨道交通隧道区间排水泵房设计 被引量:9

Design of Water Pumping Stations in Running Tunnels of Urban Rail Transit Works
下载PDF
导出
摘要 为确定区间废水泵房的排水方式以及合理的选择水泵,本文对轨道交通隧道区间的2种排水方案进行了对比,同时对多台排水泵并联运行的工况进行了校核,得出如下结论:1)隧道区间的排水泵房需经过方案对比后选择合理的方案;2)应根据水泵厂家样本资料对单泵工况和双泵工况进行校核,从而选择出合适的水泵,使水泵在单双泵工况下都工作在高效区,而不是简单的进行流量的叠加。 The advantages and disadvantages of two water pumping schemes commonly adopted in running tunnels in ur- ban rail transit works are compared and the parallel operation of several pumps are checked, in order to select rational and feasible waste water drainage scheme. Conclusions drawn are as follows : 1 ) Appropriate scheme should be selected for the water pumping stations in running tunnels through careful comparison and contrast; 2) The single-pump operation mode and the double-pump operation mode should be checked according to the data provided by the pump manufacturer so as to select appropriate pumps so that the pumps can work with high efficiency, whether .in single-pump mode or in double-pump mode.
作者 刘宗洲
出处 《隧道建设》 2011年第5期588-592,共5页 Tunnel Construction
关键词 轨道交通 隧道区间 排水泵房 长距离输水 并联运行 urban rail transit running tunnel water pumping station long distance water pumping parallel operation
  • 相关文献

参考文献13

  • 1吴飞,崔彦枫,李祥立,邹平华.水泵性能曲线方程研究[J].暖通空调,2006,36(10):63-66. 被引量:19
  • 2上海市建设和交通委员会.GB50015-2003建筑给水排水设计规范[S].北京:中国计划出版社,2003.
  • 3北京城建设计研究总院.GB50157-2003地铁设计规范[S].北京:中国计划出版社,2003.
  • 4上海市建设和交通委员会.GB50014-2006室外排水设计规范[S].北京:中国计划出版社,2003.
  • 5Wittmann F H, ZHAN H, ZHAO T. Chloride penetration in- to water repellent concrete exposed to sea water in the tidal zone[C]// J. Silfwerbrand Proe. Fourth Int. Conf: Water repellent treatment of building materials. [ S. 1. ] : Aedifieatio Publishers, 2005 : 125 - 132.
  • 6ZHAN H, Wittmann F H, ZHAO T. Chloride barrier for concrete in saline environment estabilished by water repellent treatment[J].Int.J.Restoration of Buildings and Monuments,2003(9):535-550.
  • 7Odd E. Gj6rv. Durability design of concrete structures in se- vere environments [ M ]. London- Spon Press,2009.
  • 8Hope B B, Page J A, Poland J S. The determination of the chloride content of concrete [ J ]. Cement and Concrete Re- search, 1985 ( 15 ) : 863 - 870,.
  • 9石有才.既有运营隧道增建“喇叭口”施工技术[J].现代隧道技术,2004,41(5):46-51. 被引量:5
  • 10王明年,潘晓马,张成满,温向东,王慨慷.邻近隧道爆破振动响应研究[J].岩土力学,2004,25(3):412-414. 被引量:138

二级参考文献7

共引文献157

同被引文献37

引证文献9

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部